Golden State Medical Supply recalls 2.5 mg enalapril tablets with CGMP deviations. Affected lots expired by 2023. Consumers should contact for details.
CGMP Deviations
Golden State Medical Supply is recalling enalapril maleate tablets that were manufactured with CGMP deviations. This recall is due to potential quality issues that could affect safety.
CGMP deviations mean the manufacturing process did not meet quality standards. This could lead to unsafe drug levels or impurities in the tablets. However, the specific risk is not clearly stated in the recall notice.
People who own or use the recalled enalapril tablets are affected. Those with high blood pressure or on related medication are most at risk.
Check for the NDC code 60429-183-90 on the packaging. The lots listed include GS028301 through GS040149 with expiration dates up to 11/2023.
Look for the NDC code 60429-183-90 on the packaging to confirm if your tablets are affected.
The recall is due to CGMP deviations during manufacturing, which could affect the safety and quality of the tablets.
Check for the NDC code 60429-183-90 and the specific lots listed (GS028301 through GS040149) on the packaging.
The recall notice does not specify a remedy, so contact Golden State Medical Supply for further instructions.
We’ve drafted a message you can send Golden State Medical Supply to request your refund or repair — edit it as you like.
Subject: Recall D-1177-2022 — Golden State Medical Supply Golden State Medical Supply Hello, I own a Golden State Medical Supply that is covered by recall D-1177-2022 from Golden State Medical Supply. I’m writing to arrange the remedy described in the recall (a refund, repair, or replacement as applicable). Could you please tell me the next steps to resolve this? Thank you.
Experiences, tips, and questions from readers. Every comment is reviewed before it appears.
No comments yet — be the first to share your experience.
The facts (hazard, remedy, dates, manufacturer) are pulled from the official FDA recall record. The plain-language summary and step-by-step checklist are written by GovInfoNow to make the official notice easier to act on — they don’t replace it.